EIAs for proposed activities in Antarctica prepared by the UK

 

Final Comprehensive Environmental Evaluations

Fothergill, C., (2018), Final Comprehensive Environmental Evaluation for Rothera Wharf Reconstruction & Coastal Stabilisation (12.4MB)

Download Appendices – Final Comprehensive Environmental Evaluation for Rothera Wharf Reconstruction & Coastal Stabilisation (17.6MB)

Download Final Non Technical Summary pdf version (0.5MB)

Lake Ellsworth Consortium., (2012) Final Comprehensive Environmental Evaluation for the Proposed Exploration of Lake Ellsworth, Antarctica. (3.42 MB).

Shears, J.R., Downie, R.H. and Pasteur, E. (2007). Proposed Construction and Operation of Halley VI Research Station and Demolition and Removal of Halley V Research Station, Brunt Ice Shelf, Antarctica: Final Comprehensive Environmental Evaluation.

Bonner, W.N., R.I. Lewis-Smith and D.W.H. Walton (1989). Final Comprehensive Evaluation for the proposed construction of an airstrip at Rothera Point, Antarctica.

Draft Comprehensive Environmental Evaluations

Fothergill, C., (2018), Draft Comprehensive Environmental Evaluation Rothera Wharf Reconstruction & Coastal Stabilisation (12.4MB)

Draft Appendices (17MB)

Lake Ellsworth Consortium, (2011), Draft Comprehensive Environmental Evaluation for the Proposed Exploration of Lake Ellsworth, Antarctica (2.37 MB).

Initial Environmental Evaluations

Initial Environmental Evaluation for Rothera Runway Resurfacing and Lighting, Site Investigation and Condition Survey Works 2022-2023.

Initial Environmental Evaluation for Over-snow Traverse Activities 2022-2027

Hughes, K., (2021), Initial Environmental Evaluation for Rothera East Beach Hut (2.5 MB)

Clarke, R.J, and Mulvaney, R., (2019) Initial Environmental Evaluation – WACSWAIN Sherman Island (1.5MB)

Fothergill, C. (Sept 2019) Initial Environmental Evaluation for Rothera Modernisation Phase 1 (9MB)

Download appendices – IEE Rothera Modernisation Phase 1 (24MB)

Thwaites Glacier Programme IEE

Clarke, R.J., Mulvaney, R., (2018) Initial Environmental Evaluation for Proposed Deep Ice Core Drilling Project on Skytrain Ice Rise, Antarctica

Fothergill, C (Sept 2017)Initial Environmental Evaluation for Rothera Site Investigation Season 2   Addendum 1   Addendum 2

Fothergill, C, (Feb 2017) Initial Environmental Evaluation for Rothera Site Investigation

Clarke, R.J., Bradley, A., (2016) Initial Environmental Evaluation for the Halley Relocation Project

Fothergill, C., Smith, A., (2016) Initial Environmental Evaluation for BEAMISH: Basal Conditions on Rutford Ice Stream: Bed Access, Monitoring and Ice Sheet History.

Clarke, R.J., Corr, H., Nicholls, K., (2016) Initial Environmental Evaluation for the Science Projects on the Filchner-Ronne Ice Shelf

Fothergill, C., Smith, A., and Clarke, R.J. (2013). Initial Environmental Evaluation for the iSTAR: Ice Sheet Stability Research Programme.

Clarke, R.J., Mulvaney, R., (2011). Initial Environmental Evaluation for the Proposed Deep Ice Core Drilling Project on Fletcher Promontory, Antarctica.

Clarke, R.J, Smith, A., (2011). Initial Environmental Evaluation for the Proposed iSTAR: Ice Sheet Stability Research Programme.

Downie, R.H., Ingham, D., Hughes, K. and Fretwell, P. (2005). Initial Environmental Evaluation: Proposed Redevelopment of Rothera Research Station, Rothera Point, Adelaide Island, Antarctica.

Downie, R.H., R. Mulvaney and J.R. Shears (2001). Initial Environmental Evaluation for a proposed deep ice core drilling project on Berkner Island.

Downie, R.H. and J.R. Shears (2000). Initial Environmental Evaluation for the proposed construction and operation of a clean air sector laboratory (CASlab) at Halley Research Station, Antarctica.

Shears, J.R. and R.H. Downie (1999). Initial Environmental Evaluation for the proposed construction of an accommodation building and operations tower at Rothera Research Station, Rothera Point, Adelaide Island, Antarctica.

Shears, J.R., M.J. Jarvis and F-J. Lübken (1997). Initial Environmental Evaluation (IEE) for the proposed use of mesospheric micro-rockets during the 1997/98 austral summer at Rothera Research Station, Adelaide Island, Antarctica.

Jarvis, M.J. and J.R. Shears (1996). Initial Environmental Evaluation for the Medium Frequency Spaced Antenna Radar at Rothera Research Station, Rothera Point, Adelaide Island, Antarctica.

Shears, J.R. (1995). Initial Environmental Evaluation for the redevelopment of Signy Research Station, Signy Island, South Orkney Islands, Antarctica.

Shears, J.R. (1995). Initial Environmental Evaluation for the expansion of Rothera Research Station, Rothera Point, Adelaide Island, Antarctica.

Poles Apart (1990). Initial Environmental Evaluation for the rebuilding of the research station, Signy Island, South Orkney Islands, Antarctica.